| Date | 5-3-11 |
| Start | 7:00 |
| Stop | 10:00 |
| Break | 8:42-8:46 |
Director: Ron Watson
Stage Manager: Jessie Drollette
512.299.2053
Late:
Missing: Leslie, Cathie (e), Brandon
Didn't Sign in: Chelsea
| General Got through to scene 7. |
| Next Rehearsal/Schedule Wednesday 5/4/11 7:00 ON THE STAGE!!!! Act 1 scene 8 thru rest of show. |
| Set Cut the second chair on the raceway. Punch list on bottom |
| Props Need a suitcase for Herr Schultz We're getting opaque cups for the prairie oysters yes? |
| Sounds/Lights/Special FX |
| Costumes Prop hats (that will stay on) for kickline 7 Jessie |
| Dance |
| Director to buy list for Painting (by Monday!) 2 more burgundies 12 cans of gold spray paint (same as Steve brought or more bronzey) 3 Krylon brand for Plastic golds 3 gallons semi gloss black-black (behr preferred) Plus edgers, rollers etc. |
| Music What are we going to do about preshow recordings? |
| Dialect Really good, nice improvement and consistency! Ismael, you swallowed after (making a pass after her) place more forward please. Und remember FROYLINE. Sanks! |
| Actors Since the cigarette lights up at tip, could you just inhale Chelsea instead of using a match? Will that work? |
| Crew |
| Accident/Incident |
| Quote(s) "I'm okay, keep going" Sam |
Punch list
Two more table tops to match front row
Table matching other tables but that someone could stand on
Railing: handrail, weld joint, Steve will call
Or maybe Cody?
Finish USR spiral stairs
Put a luan facing in the traveling platform (only three sides) Steve, do you want all the way to floor or just from step to top?
Insulate platforms
Reinforce picture frames
Add staples to tie line and add 1 X 3 if necessary
Trim 12 X 5
Add scrim material to L, F, R, O and 12 X 5 (Jessie)
Re weight batons 3, 4, 5, 6
Pad SR corner of traveling platform
Cover house tables (barb) and mount
Downstage Left plaftform assemble and connect to SL stairs
Connect back and front railing together on SR of raceway
Finish mounting frames on proscenium (jessie/steve)
Project onto the one frame with scrim to see how will work
Fabric masking on the upstage side of the Upstage platform
Possibly build a piano for electric keyboard to sit in
Jessie looking at piano at goodwill to see if maybe can modify
Take lip off stage
Replace/clean off the electric face plate SL
Rodd/Tamar/Steve look for Ruby colored felt
Mount DS SL lights (ron/rodd)
Cover fire extinguisher sign
putt padding on SR corner of traveling platform step
Paint list
Paint floor (Steve) please make sure to get blue.
Paint railing and frames (barb)
Paint underside of raceway/catwalk
Paint SL side of stage
Paint proscenium both right and left near floor
Paint two extra bentwoods black