Tuesday, May 3, 2011

Cabaret Rehearsal report 5/3/2011

Cabaret

Rehearsal report

 

Date

5-3-11

Start

7:00

Stop

10:00

Break

8:42-8:46

Director: Ron Watson

Stage Manager: Jessie Drollette

512.299.2053

 

 

 

Late:  

Missing: Leslie, Cathie (e), Brandon

Didn't Sign in: Chelsea

General

Got through to scene 7.         

Next Rehearsal/Schedule

Wednesday 5/4/11 7:00 ON THE STAGE!!!!

 Act 1 scene 8 thru rest of show. 

Set

Cut the second chair on the raceway. 

Punch list on bottom

Props

Need a suitcase for Herr Schultz

We're getting opaque cups for the prairie oysters yes?

Sounds/Lights/Special FX

Costumes

Prop hats (that will stay on) for kickline 7 Jessie

Dance

Director

 to buy list for Painting (by Monday!)

2 more burgundies

12 cans of gold spray paint (same as Steve brought or more bronzey)

3 Krylon brand for Plastic golds

3 gallons semi gloss black-black (behr preferred)

Plus edgers, rollers etc. 

Music

What are we going to do about preshow recordings? 

Dialect

Really good, nice improvement and consistency!  Ismael, you swallowed after (making a pass after her) place more forward please.  Und remember FROYLINE.  Sanks!

Actors  

Since the cigarette lights up at tip, could you just inhale Chelsea instead of using a match? Will that work?

Crew

Accident/Incident

Quote(s)

"I'm okay, keep going" Sam

 

Punch list

Two more table tops to match front row

Table matching other tables but that someone could stand on

Railing: handrail, weld joint, Steve will call

   Or maybe Cody?

Finish USR spiral stairs

Put a luan facing in the traveling platform (only three sides) Steve, do you want all the way to floor or just from step to top?

Insulate platforms

Reinforce picture frames

            Add staples to tie line and add 1 X 3 if necessary

Trim 12 X 5

Add scrim material to L, F, R, O and 12 X 5 (Jessie)

Re weight batons 3, 4, 5, 6

Pad SR corner of traveling platform

Cover house tables (barb) and mount

Downstage Left plaftform assemble and connect to SL stairs

Connect back and front railing together on SR of raceway

Finish mounting frames on proscenium (jessie/steve)

Project onto the one frame with scrim to see how will work

Fabric masking on the upstage side of the Upstage platform

Possibly build a piano for electric keyboard to sit in

            Jessie looking at piano at goodwill to see if maybe can modify

Take lip off stage

Replace/clean off the electric face plate SL

Rodd/Tamar/Steve look for Ruby colored felt

Mount DS SL lights (ron/rodd)

Cover fire extinguisher sign

putt padding on SR corner of traveling platform step

 

Paint list

Paint floor (Steve) please make sure to get blue. 

Paint railing and frames (barb)

Paint underside of raceway/catwalk

Paint SL side of stage

Paint proscenium both right and left near floor

Paint two extra bentwoods black

 

 

 

 



 