Saturday, May 7, 2011

Cabaret tech rehearsal report 5/7/2011


Cabaret

Tech Rehearsal report

 

Date

5-7-11

Start

1:30

Stop

11:00

Break

5:00-6:30  9:10-9:20

Director: Ron Watson

Stage Manager: Jessie Drollette

512.299.2053

 

 

 

Late:  Steve,

Missing:

Didn't Sign in:

General

Thanks for your patience today, really got a lot done!

Next Rehearsal/Schedule

Sunday May 8th, 2011 (member to say happy mother's day to yo mamma's!")

2:00- Josh

2:30-Matt, Chelsea

3:00 Phil

3:30 all cast

3:45 all cast scene 11

4:15-4:45 Money

Dinner break

6:30 call for finishing Act two

Then starting again and running show. 

 

Sorry guys, we tried really hard to come up with a schedule that mushed all the work together, this is the best we could come up with. 

Facility

Mens Bathroom Toilet is missing the floater tugger.  Jessie will fix Sunday. 

Set

Punch list on bottom

 

SET SAFETY CONCERNS

  1. Concerns or problems with hanging flats (bolt hangers/ chains/ flat separation/ attachments/ etc.
  2.  Concerns or problems with platforms and stairs (stability/platform sway & sponginess/ cracked or broken joists or supports/ etc.)
  3. Concerns or problems with stationary flats and large props
  4. Any other problems or concerns

Props

Sounds/Lights/Special FX

Costumes

Hat for Chelsea, Robe for Melita

Pull straps

Dance

Director

Get us glow tape please

Music

What are we going to do about preshow recordings? 

Dialect

Actors  

Crew

Chair was missed in scene change for Cliff's room

Crew call is 6:30

Accident/Incident

Quote(s)

"If I walk thru the alley like this again, I'll be nailed" Josh

"time for a new piece of ass" Kirk

 

Punch list

USR add masking

USL add masking

Railing: handrail, weld joint, Steve will call

   Or maybe Cody?

Reinforce picture frames

            Add staples to tie line and add 1 X 3 if necessary

Add scrim material to L, F, R, O and 12 X 5 (Jessie) ran out of fabric.  Also, Steve you need to look at F and L before we add scrim. 

Re weight batons 3, 4, 5, 6

Connect back and front railing together on SR of raceway

Project onto the one frame with scrim to see how will work  We do get a double image, need to see if we hate it. 

Rodd/Tamar/Steve look for Ruby colored felt

Cover fire extinguisher sign

Pipe railing on Stage Left

Build cozies in audiences

 

Paint list

Paint floor (Steve) please make sure to get blue.  (where the red isn't) Please don't paint over our spike tape!

Paint railing and frames (barb)

Paint underside of raceway/catwalk

Paint SL side of stage

Paint proscenium both right and left near floor

Paint two extra bentwoods black

Barb-cover tables

Piano needs painting

Paint cozies

Paint luan inside traveling platform

Paint ladder

 

 

 

 


 